Whirlpool Dishwasher | WH8IC15B4M6LHC0 | Built-in | Width 60 cm | Number of place settings 15 | Energy efficiency class C | DispTrauku mazgājamās mašīnas Cena:562,41 € Pievienot grozam
Whirlpool Dishwasher | WSBO 3O34 PF X | Built-in | Width 45 cm | Number of place settings 10 | Number of programs 8 | Energy effTrauku mazgājamās mašīnas Cena:411,98 € Pievienot grozam
Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm | Veļas žāvētāji Cena:671,68 € Pievienot grozam
Whirlpool Dryer WPS D8 WBS EE, White, 8kg, Energy class D, Heat pump, Depth 54,5 cm / WPSD8WBSEEVeļas žāvētāji Cena:574,81 € Pievienot grozam